FDOT US-90 (Beaver St) from McDuff Ave to Stockton St.

The US-90 (Beaver St) project consists of demoing existing roadway and sidewalk and reconstructing with new curb and gutter, roadway and sidewalk for .88 miles.  Work on this project will begin in August, 2015.

Latest News

Copyright © 2013 J.B. Coxwell Contracting, Inc. All Rights Reserved.