Our Projects

SR-212 Project

This project consisted of the design and construction of SR-212 (Beach Blvd.) from a 4-lane rural roadway to a 6-lane urban roadway in Jacksonville, Florida.

JTB Improvements

The improvements under this contract consisted of widening 3.604 miles of SR-202 (J. Turner Butler Blvd.) from a four lane limited access facility to a six lane limited access facility from Kernan Blvd. to San Pablo Pkwy in Duval County, Florida.

Jacksonville Arena and Sports Complex Parking

Alltel Stadium infrastructure and Sports Complex Parking Site rehabilitation for Alltel Stadium, Jacksonville Memorial Arena and Baseball Grounds. All inclusive utilities: storm, water, force main, fire main, chilled water communication and electrical systems. Extensive hardscape and streetscape project.

Home Depot & Target Yulee, Florida

Commercial retail site development including massive clearing, 1/2 million CY fill dirt, grading, all underground utilities including lift station, construction of building pad, parking lots, curb, gutter, sidewalk & traffic separators. Obtained certifications for turnover to vertical contractor.

Ring Power Corporate Headquarters

Site development of 135 acre office complex, warehouse and shop facilities, complete utility infrastructure, 3.2 miles of arterial roadway, comprehensive storm management system, all power distribution, lightning, signalization and landscaping with irrigation system.

I-95 and St. Augustine Road Interchange

Construction of new Interchange to I-95 including roadway, bridge, utilities, drainage, pond construction, bridge lightning and landscaping.

Cecil Equestrian Center

Entire site development and construction of outdoor infrastructure including master stormwater management system, water distribution system, sanitary sewer conveyance system, roadway, lightning, signals, all concrete work and landscaping.

Home Depot & Walmart Middleburg, Florida

Two separate commercial retail development directly across from each other which included clear & grub, over 1.5 million CY fill, grading, building pads, parking lots, lightning, signals, curb, gutter, sidewalks, traffic separator, fencing and landscaping.

Branan Field / Chaffee Road Widening

Widening from Argyle Forest Blvd. to 103rd Street – Jacksonville Florida Construction of two new northbound traffic lanes, resurfaced two existing southbound lanes, added turn lanes, installed traffic signals, lightning, roadway signs, traffic separator, curb & gutter and grassing. Added turn lanes, resurfaced two existing southbound lanes, installed traffic signals, lightning roadway signs traffic separator, curb & gutter and grassing.

JEA Total Water Management Plan Segment

J.B. Coxwell Contracting, Inc. was contracted to construct a large water distribution piping project that connected the north grid wells to the south grid. This undertaking consisted of installing over 16,000 LF of 36” to 24” size ductile iron pipe underneath active streets, highways and railroads.