Otis Road Landfill

Timelapse of our recent Otis Road Landfill project.

Otis Road Landfill Cell 3 included work in constructing approximately a 6.5-acre cell located on the Southwestern side of existing cell 2.

This project consisted of performing excavation, backfill, berm construction, and cover sand over the cell liner on the third piece of the initial four cells to be constructed and filled with C&D.
JBCCI installed the Leachate collection system down the cell and into a constructed sump, along with the riser pipes up to a vault.

After completion of work inside the cell, the outside berms were sodded, and the landfill was turned over for final review and approval to place C&D in the newly constructed cell.